
Updated Apr-2026 Exam C-TS422-2504 Dumps - Pass Your Certification Exam
Latest Real SAP C-TS422-2504 Exam Dumps Questions
SAP C-TS422-2504 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION # 11
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Capacity requirements chart
- B. Order (dispatched) chart
- C. Order (pool) chart
- D. Work center capacities chart
Answer: A,D
NEW QUESTION # 12
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Plant
- B. Material
- C. Work center
- D. Production version
Answer: B,C
NEW QUESTION # 13
Which of the following is a scheduling method for a production order?
- A. Determination of basic dates
- B. Determination of delivery date
- C. Key date scheduling
- D. Lead time scheduling
Answer: D
NEW QUESTION # 14
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Integrate clean core practices in the end-to-end value process chain.
- B. Establish regular housekeeping tasks and procedures.
- C. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
- D. Establish release management.
- E. Define roles and responsibilities as part of a process transformation office.
Answer: C,D,E
NEW QUESTION # 15
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Planning strategy
- B. Requirements type
- C. Requirements profile
- D. Order type
Answer: A,B
NEW QUESTION # 16
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Inhouse production time
- C. Operation duration
- D. Planned delivery time
Answer: B,D
NEW QUESTION # 17
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.
- A. They are only created for multilevel bill of material (BOM) structures.
- B. They are created on assembly level during the planning run.
- C. They are created together with the independent requirement for the finished product.
- D. They are created with exact times in Advanced Planning.
Answer: B,D
NEW QUESTION # 18
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When several operations are maintained for one product
- B. When multiple planned orders are scheduled in parallel on one resource
- C. When alternative resources are used within one operation
- D. When several production versions are maintained for one product
Answer: C
NEW QUESTION # 19
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Increase the capacity supply in a time-phased interval
- B. Execute an infinite production planning run for the critical resources
- C. Reduce the planning time interval
- D. Determine a time period with available capacity on the planning board
- E. Form optimum sequences to reduce setup times
Answer: A,D,E
NEW QUESTION # 20
What is a work center hierarchy?
- A. A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel
- B. A group of work centers in a production line being used in sequence for production
- C. A group of alternative work centers providing a cumulative available capacity for production
- D. A group of alternative work centers for production structured in hierarchy levels by priorities
Answer: C
NEW QUESTION # 21
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- B. The lot size range must be within the lot size range of the assigned routing.
- C. The consistency check must be performed.
- D. The assigned routing and bill of material (BOM) must have the same validity period.
- E. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
Answer: B,C,E
NEW QUESTION # 22
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To automate material movements in material staging
- B. To optimize costs and times in production plans
- C. To solve planning problems for defined objects
- D. To set default values in production master data
Answer: C
NEW QUESTION # 23
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To make the procurement easier
- B. To reduce the number of material masters
- C. To make the assignment of components easier
- D. To enable simple structuring of BOMs
Answer: C,D
NEW QUESTION # 24
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.
- A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- B. Add the agreement to the quota arrangement mark it for MRP relevance.
- C. Add the agreement to the source list mark it for MRP relevance.
- D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Answer: C,D
NEW QUESTION # 25
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative offset time
- B. Specify a negative PP/DS horizon
- C. Specify a negative opening period
- D. Specify a negative planning horizon
Answer: A
NEW QUESTION # 26
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
- A. You can use mass processing to set production orders to technically complete.
- B. You can use trigger points to automatically create rework orders via confirmations.
- C. You can use mass processing to read PP master data for production orders.
- D. You can use the production scheduling profile to automatically set orders to technically complete.
Answer: A,B
NEW QUESTION # 27
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Whether the material is produced inhouse procured externally or both
- B. Which plantspecific plantindependent statuses are allowed
- C. Which document types class categories are allowed
- D. Which material master screens appear in which sequence
Answer: C,D
NEW QUESTION # 28
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Market intelligence
- B. One-off events
- C. Past quotation quantities
- D. Past production planning quantities
- E. Past sales order quantities
Answer: A,B,E
NEW QUESTION # 29
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the lowest explosion level at which a material occurs in all the product structures
- B. To determine the use of subitems inside the material BOM (bill of material)
- C. To determine the sequence in which materials are planned in MRP
- D. To determine the priority of alternative components inside the material BOM (bill of material)
Answer: A,C
NEW QUESTION # 30
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
- B. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
- C. MRP creates the capacity requirements on resources at the earliest possible production time.
- D. MRP creates the capacity requirements without considering existing load on the resources.
Answer: D
NEW QUESTION # 31
You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?
- A. Planning at assembly level (70)
- B. Production by lot size (30)
- C. Planning with final assembly (40)
- D. Assembly processing with production orders (82)
Answer: A
NEW QUESTION # 32
......
C-TS422-2504 Dumps To Pass SAP Certified Associate Exam in One Day: https://pass4sure.examtorrent.com/C-TS422-2504-prep4sure-dumps.html
